F1002. Laboratory building 3 up to 5 floors
F1002. Laboratory building 3 up to 5 floors
Concrete or steel frame construction.
Inclusive:
- elevator;
- radiator heating;
- air conditioning / air exhaust;
- lighting.
Exclusive:
- pile foundation;
- furniture.
Inclusive:
- elevator;
- radiator heating;
- air conditioning / air exhaust;
- lighting;
- furniture (tables and acid cabins).
Exclusive:
- pile foundation;
- science laboratory equipment.
| Model | Price per m2 GFA | |
|---|---|---|
| From | Till | |
| Bare | 1.530,- | 2.590,- |
| Furnished | 1.750,- | 3.070,- |